Sunday, November 4, 2012

Work Completed - Last Blog Post

The 2012 Resurfacing Project is now complete.

This will be the last blog update for the project. We would like to thank you for taking time to read the posts and hope you found the information useful.

Any outstanding issues should be reported to the Project Manager, Robert Steele, at (847) 904-4423.

Thank you again for your patience throughout the construction season. Your cooperation was very appreciated.

Friday, October 26, 2012

This past week, Arrow Road paved the surface layer of asphalt pavement along Raleigh Road, Vernon Drive, Hickory Court, Pam Anne Drive, and Rugen Road.

The 2012 Resurfacing Project is now complete with the exception of a few minor items remaining.

Any outstanding issues should be reported to the Project Manager, Robert Steele, at (847) 904-4423.

Thank you again for your patience throughout the construction season.

Sunday, October 21, 2012

This past week, Arrow Road performed pavement removal along Juniper Terrace, Wilmette Avenue, Indian Road, Laramie Avenue, Vernon Drive, Raleigh Road, Hickory Court, Pam Anne Drive, and Rugen Road.

The contractor also installed the asphaltic surface along Juniper Terrace, Wilmette Avenue, Indian Road, and Laramie Avenue.

The contractor anticipates installing the asphalt surface next week along Raleigh Road, Vernon Drive, Hickory Court, Pam Anne Drive, and Rugen Road.

Thank you again for all of your patience during the resurfacing project.

Friday, October 12, 2012

New Streets Added

Since the blog update last week, a few new developments have occurred.  The previous post stated that no new blog updates would be submitted.

However, the Village has decided to add portions of a few additional streets to be resurfaced this year.

The roadways to be resurfaced are:
Juniper Terrace
Indian Road
Wilmette Avenue
Laramie Lane
Vernon Drive
Raleigh Road
Hickory Court
Pam Anne Drive
Rugen Road

The work is anticipated to begin next week, the week of October 15th.

Thank you again for all of your patience throughout the construction season.

If you have any outstanding issues that you need addressed, please contact the Project Manager, Robert Steele, at 847-904-4423.

Friday, October 5, 2012

Work Completed

The project is now completed with the exception of a few minor repairs to be completed by the contractor.

This is the last blog update that will be provided for this project.

We appreciate you taking the time to read this blog.

We hope this was a valuable resource for you following the progress of work completed and what work was scheduled in the coming weeks.

Thank you again for all of your patience throughout the construction season.

If you have any outstanding issues that you need addressed, please contact the Project Manager, Robert Steele, at 847-904-4423.

Monday, October 1, 2012

This past week the remainder of the paving and pavement striping  was completed.

The project is nearly complete with only minor restoration work remaining.

Thank you for your patience throughout the entire construction process.

Any outstanding issues should be reported to the Project Manager, Robert Steele, at (847) 904-4423.

Friday, September 21, 2012


This past week Arrow Road Construction performed asphalt patching within the Police Station Parking Lot and the North Metra Station parking lot.  

Remaining asphalt paving includes work along Crabtree Lane.

Landscaping with topsoil and seed is 90% completed throughout the project.

Pavement striping is 75% completed throughout the project.

The project is nearly complete with minor work remaining.

Thank you for your patience throughout the entire construction process.

Any outstanding issues should be reported to the Project Manager, Robert Steele, at (847) 904-4423.

Friday, September 14, 2012

This past week Arrow Road Construction performed asphalt paving along Wilmette Avenue, Cariann Lane, Mark Drive, Juniper Road, Juniper Terrace, Long Valley Road, Harrison Street, and Lehigh Avenue.

Remaining asphalt paving includes work at the Metra North Station parking lot and Crabtree Lane.

Landscaping with topsoil and seed was performed at various sites throughout the Village.  Landscaping will continue throughout next week.

Pavement striping was started late in the week and will continue next week at various locations throughout the Village.  

The project is now nearing completion with a majority of the asphalt paving completed and landscape restoration and pavement striping beginning this week and continuing through next week.

Thank you for your patience throughout the entire construction process.

Friday, September 7, 2012

This past week Arrow Road Construction performed pavement removal along Wilmette Avenue, Juniper Road, Juniper Terrace, Wagner Road, Long Valley Road, Harrison Street, Harlem Avenue, Lehigh Avenue, Greenbriar Drive, Crabtree Lane, and Metra North Parking Lots.

All pavement removal associated with this project has been completed.

This past week Arrow Road Construction performed asphalt paving along Mickey Lane, Burr Oak Drive, Maple Lane, Harlem Avenue, Greenbriar Drive, and Metra North Parking Lots

Next week Arrow road anticipates asphalt paving Wilmette Avenue, Cariann Lane, Mark Drive, Juniper Road, Juniper Terrace, Long Valley Road, Harrison Street, Lehigh Avenue, and Crabtree Lane.

Landscape and pavement striping along various roadways is also anticipated to begin next week.

Parking along the street will be restricted during roadway paving.

Thank you in advance for your patience and cooperation during the roadway resurfacing project.

Friday, August 31, 2012

This past week Arrow Road Construction performed pavement removal along Mickey Lane, Burr Oak Drive, Maplewood Lane, Sleepy Hollow Road, Riverside Drive, Stevens Drive, Sheffield Drive, Hawthorn Lane, and Elizabeth Lane.  The contractor also performed asphalt paving along Elm Street, Birchwood Court, Burnham Court, Wedgewood Court, Swainwood Drive, Cedarwood Drive, Maplewood Lane, Sleepy Hollow Road, Riverside Drive, Stevens Drive, Sheffield Drive, Hawthorn Lane, and Elizabeth Lane.

Next week the contractor anticipates performing pavement removal along Mickey Lane, Burr Oak Drive, and Wilmette Ave.

The remainder of the streets are scheduled to be completed shortly thereafter.

Parking along the street will be restricted during all roadway work including paving, grading, and pavement removal. Residents will be notified of parking restrictions.

Thank you in advance for your patience and cooperation during the roadway resurfacing project.

Saturday, August 18, 2012

This past week Arrow Road Construction performed limited work due to weather conditions. Please be assured, the Village is doing everything possible to ensure the project is completed in a timely manner and limit the inconvenience to the residents.

The following is the contractor’s work schedule for next week, depending on weather condition:

Monday, August 20th: Asphalt paving on Joanne Drive, Elmdale Avenue, and Pickwick Avenue. Pavement Removal along Elm Street.
Tuesday, August 21st: Asphalt paving on Westview Lane, West Lake Frontage Road, Rolling Pass, Burnham Court, Wedgewood Court, and Simonsen Lane. Pavement removal along Birchwood Court, Elm Street, Long Valley, and Harrison. Grading on Elm Street
Wednesday, August 22nd: Grading along Elm Street
Thursday, August 23rd: Paving along Elm Street and Birchwood Court. Pavement removal along Stevens Drive, Mapplewood Lane, Sheffield Lane, Hawthorn Lane, and Elizabeth Lane.

Parking along the street will be restricted during all roadway work including paving, grading, and pavement removal. Residents will be notified of parking restrictions.

Thank you in advance for your patience and cooperation during the roadway resurfacing project.

Friday, August 10, 2012

This past week Arrow Road Construction performed pavement removal along Barry Lane, La Fontaine Drive, Burnham Court, Rolling Pass Lane, Simonsen Lane, and Wedgewood Drive.

Arrow Road also perform asphalt paving along Barry Lane, La Fontaine Drive, Rolling Pass, Grove Street, Pine Street, Charlie Court and Manu Court.

The concrete curb & gutter removal and replacements is 90% complete at this time with miscellaneous areas yet to be completed.

Next week Arrow Road Construction will continue to remove the existing pavement along various roadways within the Village. Residents will be notified prior to this work starting.  Parking on the streets will be restricted during the pavement removal process.

Arrow Road Construction will continue asphalt paving along Joanne Drive, Elmdale Avenue, Pickwick Lane, Rolling Pass Lane, Burnham Court, Simonsen Lane, and Wedgewod Drive. Parking on the streets will again be restricted during the paving process.

Friday, August 3, 2012

This past week A. Lamp Concrete Contractors completed concrete removal and replacement along Maplewood Lane, Sleepy Hollow Road, Stevens Drive, Riverside Court, and Swainewood Drive. The concrete curb & gutter removal and replacements is 90% complete at this time with miscellaneous areas yet to be completed.

This past week Arrow Road Construction performed pavement removal along Charlie Court, Manu Court, Joanne Drive, Elmdale Avenue, and Pickwick Lane.

Next week Arrow Road Construction will continue to remove the existing pavement along various roadways within the Village. Residents will be notified prior to this work starting.  Parking on the streets will be restricted during the pavement removal process.

Arrow Road Construction will begin asphalt paving along Grove Street, Pine Street, Charlie Court, Manu Court, Joanne Drive, Elmdale Avenue, and Pickwick Lane. Parking on the streets will again be restricted during the paving process.

Friday, July 27, 2012

This past week A. Lamp Concrete Contractors completed concrete removal and replacement along Wilmette Avenue, Sheffield Lane, Hawthorne Lane, Elizabeth Lane, Maplewood Lane, Sleepy Hollow Road, Stevens Drive, and Grove Street.

Next week A. Lamp will be performing concrete curb & gutter repairs along Maplewood Lane, Sleepy Hollow Road, Stevens Drive, Riverside Court, and Swainewood Drive. Residents will be notified prior to concrete work starting and if your driveway access will be restricted.   

Next week Arrow Road Construction will begin existing pavement removal along Charlie Court, Manu Court, Barry Lane, LaFontaine Drive, Joanne Drive, Elmdale Avenue, Pickwick Lane, Simonsen Lane, Rolling Pass, Crowne Lane, Executive Lane, Burnham Court, and Wedgewood Avenue. Residents will be notified prior to this work starting.  Parking on the streets will be restricted during the pavement removal process.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, July 20, 2012

This past week A. Lamp Concrete Contractors completed concrete removal and replacement along Grove Street, Barry Lane, LaFontaine Drive, Charlie Court, Manu Court, Burnham Court, Wedgwood Drive, and Simonsen Lane. Arrow Road Construction also performed pavement removal along Grove Street and Pine Street.

Next week A. Lamp will be performing concrete curb & gutter repairs along Wilmette Avenue, Sheffield Lane, Hawthorn Lane, and Elizabeth Lane. The contractor will also perform concrete base repairs along Grove Street and Pine Street. Residents will be notified prior to concrete work starting and if your driveway access will be restricted.   

Next week Arrow Road Construction will begin existing pavement removal at various locations throughout the Village. Residents will be notified prior to this work starting.  Parking on the streets will be restricted during the pavement removal process.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, July 13, 2012

This past week A. Lamp Concrete Contractors completed concrete removal and replacement along Elm Street, Birchwood Court, and Rolling Pass Lane. Concrete removal and replacement has begun on Grove Street.

Next week A. Lamp will be performing concrete curb & gutter repairs along Grove Street, Barry Lane, LaFontaine Drive, Charlie Court, Manu Court, Burnham Court, Wedgewood Drive, and Simonsen Lane depending on weather conditions. Residents will be notified prior to concrete work starting and if your driveway access will be restricted.   

Next week Arrow Road Construction will begin existing pavement removal along Grove Street, Pine Street, and Elm Street. Residents will again be notified prior to this work starting.  Parking on the streets will be restricted during the pavement removal process.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, July 6, 2012

This past week A. Lamp Concrete Contractors completed underground utility repairs along Wilmette Avenue, Barry Lane, and LaFontaine Drive.

Limited work was performed on-site during this past week due to July 4th Holiday and excessive heat.

Next week A. Lamp will begin concrete curb & gutter repairs along Elm Street, Birchwood Court, Rollling Pass Lane,  and Grove Street depending on weather conditions. Residents will be notified prior to concrete work starting and if your driveway access will be restricted.   

This construction may affect local travel times during the next two weeks. There will be frequent lane closures and road detours to accommodate the construction.  Please adjust your schedules to allow for additional travel times to your destinations.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, June 29, 2012


This past week A. Lamp Concrete Contractors completed underground utility repairs along Grove Street and began the underground utility repairs along Wilmette Avenue.

Next week A. Lamp will continue underground utility repairs on Wilmette Avenue, Barry Lane and La Fontaine Drive. Following the July 4th Holiday A. Lamp is also anticipating to begin concrete curb & gutter repairs along Elm Street, Birchwood Court, Rollling Pass Lane,  and Grove Street depending on weather conditions. Residents will be notified prior to concrete work starting and if your driveway access will be restricted.   

This construction may affect local travel times during the next two weeks. There will be frequent lane closures and road detours to accommodate the construction.  Please adjust your schedules to allow for additional travel times to your destinations.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Happy 4th of July.

Friday, June 22, 2012

This past week A. Lamp Concrete Contractors began underground utility spot repairs along Grove Street

Next week A. Lamp will continue underground utility repairs along Grove Street. 

This construction may affect local travel times during the next two weeks. There will be frequent lane closures and road detours to accommodate the construction.  Please adjust your schedules to allow for additional travel times to your destinations.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, June 15, 2012


This past week A. Lamp Concrete Contractors completed underground utility spot repairs along Rolling Pass.

Next week A. Lamp will begin underground utility spot repairs along Grove Street.

Paving operations will not begin until mid-July

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, June 8, 2012

This past week A. Lamp Concrete Contractors performed underground utility spot repairs along Elm Street.

Next week A. Lamp will begin underground utility spot repairs along Rolling Pass.

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Friday, June 1, 2012

List of streets scheduled for work:
La Fontaine Drive: Robin Lane to Joy Lane
Barry Lane: La Fontaine Drive to South End
Burr Oak Drive: All
Mickey Lane: Winnetka Road to Burr Oak Drive
Joanne Drive: Pfingsten Road to Michael Lane
Wilmette Avenue: Indian Road to East End
Grove Street: Waukegan Road to Depot Street
Rolling Pass Lane: Glenview Road to Linneman Street
Elm Street: Golf Road to Harrison Street
Birchwood Court: Shermer Road to Spruce Street
Charlie Court: Willow Road to East End
Manu Court: Charlie Court to North End
Swainwood Drive: Cedarwood Court to West End
Cedarwood Court: Swainwood Drive to North End
Hawthorn Lane: East Lake Avenue to Elizabeth Lane
Elizabeth Lane: Raleigh Road to Hawthorn Lane

During the duration of the project, access to driveways may be limited due to work being performed. We will try to give as much notice as possible when this will occur. Thank You for your patience and understanding during these times.

Work is scheduled to begin on Monday, June 4, 2012, with underground utility improvements along Elm Street. Weather permitting.